SH + VLR

SH + VLR

Wall tie preinstalled in concrete. SH is embedded separately through the concrete. After the concrete is dry, install a counter plate (VLR) to fasten the insulation. The end of SH is bent into the brick seam at the worksite. Length: installation + air gap + 210mm....
PRKR + TS

PRKR + TS

Movement-allowing wall tie for wooden frame. PRKR is screwed into the wooden frame with a tool installed in a power drill. The installation is fastened with a counter plate (VLR). The brick tie is installed into brick seams simultaneously with brickwork. PRKR length:...
THR + VLR + TS

THR + VLR + TS

Movement-allowing wall tie for concrete frame. Drill a 40mm deep hole and wedge with an installation tool (ASPU-R). The insulation is fastened with a counter plate (VLR). The brick tie is installed into brick seams simultaneously with brickwork. THR length: insulation...
TRM + VLR

TRM + VLR

Used in parallel masonry. The bent end is bricked in first. The insulation is pressed in the tie and fastened with a counter plate (VLR). The end of the tie is bent into the brick seam. Minimum length: insulation thickness + air gap + 180mm. Rustproof parts. Available...
TPR + VLR

TPR + VLR

Used when the insulation and brick cladding are fastened to wooden frame. Installed with the bending and hammering peg (LYTA). The insulation is fastened with a counter plate (VLR). The end of the tie is bent into the brick seam. Minimum length: insulation thickness +...